Past Jobs

Hot Mix Asphalt Overlay:

Herback Construction Past Project - Hot Mix Asphalt Overlay

Owner:  California Department of Transportation (Caltrans)
Contract:  $1,976,988.00
Location: Mono County, California
Job Summary:
HGE's paving division was awarded a Caltrans overlay project in Mono County on State Hwy 167. The project included placing 11,300 TN of 3/8" Dense Type A PG 64-28PMLAS Hotmix Asphalt. Herback's quality control team insured another outstanding project for the State of California Department of Transportation (Caltrans). The anticipated start date was be July 16, 2012 and continued through August 2012.


Pfeiffer Big Sur State Park Entrance and Day Use Development:

Herback Construction Past Project - Pfeiffer Big Sur State Park Entrance and Day Use Development

Owner:  State of California Natural Resources Agency Department of Parks and Recreation
Contract:  $3,291,094.00
Location: Big Sur, California
Photo Gallery: Click Here
Job Summary:
The project consists of clearing and grubbing the jobsite, removing asphalt, debris and a kiosk; realign sewer lines, install a lift station, water lines, storm drains, and electrical. Grade the site, excavate, construct trail and wood deck and install prefabricated vehicle and pedestrian bridges; realign and repair roads, resurface the parking lot, install landscape and irrigation; renovate existing residence to a visitor center and office facility and construct a new entrance kiosk and restroom.


Mendocino Woodlands State Park Water System Repair:

Herback Construction Past Project - Mendocino Woodlands State Park Water System Repair

Owner:  State of California Natural Resources Agency Department of Parks and Recreations
Contract:  $1,434,000.00
Location: Mendocino Woodlands State Park in Mendocino County, California
Photo Gallery: Click Here
Job Summary:
HGE began construction of Mendocino Woodlands State Park Water System Repair in November of 2011. The project includes over 12,000 LF of underground piping, two new wood frame buildings to house the water treatment plants, two new water treatment plants, relocation of existing water storage tanks and the addition of 3 new 10,000 gallon water storage tanks. This project is in a remote location requiring outstanding planning and execution to get the job done on time, on schedule and on budget.





<< First    < Back Go to Page: 1 2 3 4 5 6 7 8 9 10 11 12 13      Next >    Last >>