2011 Waterline Replacement Project:

Herback Construction Past Project - 2011 Waterline Replacement Project

Owner:  Kingsbury General Improvement District
Contract:  $887,428.09
Location: Stateline, Nevada
Photo Gallery: Click Here
Job Summary:
The project included installation of approximately 7,060 lineal feet of 8" PVC pipe, service lines, pressure reducing valve and vault, air release valves, and fire hydrants.


Lompoc Municipal Water Well No. 11:

Herback Construction Past Project - Lompoc Municipal Water Well No. 11

Owner:  City of Lompoc
Contract:  $1,749,443.00
Location: Lompoc, California
Photo Gallery: Click Here
Job Summary:
The testing and equipping of Municipal Water Well No. 11 and installation of 16" transmission water main. Work included Phase One well drilling construction, development and testing. Phase Two included the equipping of Well No. 11 and the installation of 16" transmission main; clearing, grubbing, disposal, site work, earthwork, excavation, trenching, asphalt pavement. Two fiberglass buildings - one housing the pump and the other housing electrical controls.


Hawkins Peak Communication Facility Project:

Herback Construction Past Project - Hawkins Peak Communication Facility Project

Owner:  County of Alpine
Contract:  $1,674,522.30
Location: Hawkins Peak in Alpine County, California
Photo Gallery: Click Here
Job Summary:
Construction of an A-frame structure, battery vault, LPG tanks and generator. Also, construction of a 41-foot tower, underground conduit and prefabricated building.