Past Jobs

CA FTNP YOSE 14(5) & 219(2), South Entrance Wawona Road & Mariposa Grove Road:

Owner:  Federal Highway Administration (FHWA)
Location: Yosemite National Park
Job Summary:
This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.8 miles of roadway on the CA FTNP YOSE 14(5) & 219(2) project in Yosemite National Park, Mariposa County, California. Work is included on 0.9 miles Wawona Road at the South Entrance, and 1.9 miles of Mariposa Grove Road from the South Entrance to the Lower Grove.


Construction on State Highway in Mono County from Rte 270 to Jack Sawyer Road:

Herback Construction Past Project - Construction on State Highway in Mono County from Rte 270 to Jack Sawyer Road

Owner:  Caltrans 09-360604
Contract:  $4,408,631.00
Location: Bridgeport, California
Photo Gallery: Click Here
Job Summary:
Construction on state highway in Mono County from Route 270 to 0.1 Mile north of Jack Sawyer Road.


Camp Richardson Campground Reconstruction & Retrofit BMP:

Herback Construction Past Project - Camp Richardson Campground Reconstruction & Retrofit BMP

Owner:  USDA Forest Service
Contract:  $3,379,614.00
Location: South Lake Tahoe, California
Photo Gallery: Click Here
Job Summary:
Camp Richardson Campground Reconstruction includes complete reconstruction of two campgrounds at Camp Richardson Resort near South Lake Tahoe, California. This work includes, but is not limited to: tree removal, clearing and grubbing, fill and excavation, aggregate base placement, asphalt placement, minor utility work, campsite furniture relocation, road barrier placement and culvert installation. Additionally, this project involves the relocation of a bike path, construction of a pedestrian path and the construction of access roads. These items will require traffic control and occur within the right-of-way for California Highway 89. The project also includes several optional bid items. These include: construction of an additional campsite loop, installation of a pre-constructed entrance building, alternative for paving the pedestrian path, installation of a sewer lateral for a future restroom and additional aggregate base parking spaces.





<< First    < Back Go to Page: 1 2 3 4 5 6 7 8 9 10 11 12 13      Next >    Last >>