Current Jobs

NV FLAP 300(1) Fossil House Road :

Owner: US Department of Transportation Federal Highway
Contract: $3,439,681.00
Location: Berlin Ichthyosaur State Park Nye County, Nevada
Project Documents: Click Here
Job Summary – Restoration, Resurfacing, Rehabilitation and Reconstruction (4R), Widening, Grading, Drainage, and Retaining Wall.


YOSEMITE South-side Drive & Bridalveil Parking:

Owner:  National Park Services, Yosemite National Park
Contract: $9,308,696.24
Location: Mariposa County, California
Project Documents: Click Here
Job Summary – Earthwork, Aggregate Courses, Hot Asphalt Concrete Paving, Drainage, Rockery Wall, Water Sanitary Sewer, Electrical, and Communication Work.


PFEIFFER BIG SUR STATE PARK:

Owner:  California State Parks and Recreation
Contract: $594,288.00
Location: Monterey County, California
Project Documents: Click Here
Job Summary – Furnish all labor, materials, tools and equipment necessary to reinstall Weyland Bridge at PFEIFFER BIG SUR STATE PARK in Monterey County, California.


Plymouth Drive Reconstruction :

Owner: Douglas County Public Works
Contract: $316,150.00
Location: Douglas County, Nevada
Project Documents: Click Here
Job Summary: Install approximately 36,000 SF of pulverizing and repaving, pavement striping, aggregate V-ditches, concrete curbs, valley gutters, and related appurtenances.


CA FLAP NEV 40 Donner Pass Road:

Owner:  US Department of Transportation Federal Highway
Contract: $16,515,011.30
Location: Nevada & Placer County
Project Documents: Click Here
Job Summary:
Restoration, Resurfacing, and Rehabilitation (3R+) Widening, Grading, Drainage, and Asphalt Concrete Pavement


South Tahoe Greenway Shared Use Trail Phase 1B & 2 Project:

Owner:  Department of Transportation
Contract: $3,648,829.38
Location: El Dorado County, District 5, California
Project Documents: Click Here
Job Summary:
Construct a Class 1 shared use trail, includes a 10 FT wide paved path with 2 FT aggregate base shoulders, precast concrete boardwalk system, tubular steel railing, and a prefabricated bridge over Trout Creek, clearing and grubbing, tree removal, excavation and grading, asphalt concrete paving, drainage improvements, bridge abutments, signing & striping, pavement markings, re-vegetation, dewatering, traffic control and erosion control.